Bring certainty, get things moving and maximise the value of your investment. Russell’s design philosophy revolves around the importance of pragmatic, thoughtful design through efficient spatial arrangements and sustainability, rather than complicated details and expensive materials for the spoilt. This philosophy maximizes peoples lives and gets the most bang for your buck.
The following are Design Stages of a project based on the RIBA Plan of Work and The American Institute of Architects (AIA) Five Phases of Architecture.
Deliverables: Program, Zoning Summary, Existing Condition drawing(s)
Duration: usually 2-4 weeks
Deliverables: Preliminary Site and Floor Plans, Preliminary Exterior 3D Concept (if applicable)
Duration: usually 4-8 weeks
Deliverables: Coordinated MEP & Structures Drawing Set with Outline Specifications
Duration: Duration: usually 8-12 weeks
Deliverables: Drawings with Construction Details with Specifications for Construction
Duration: usually 8-12 weeks